Kategori A-projekter

På denne side offentliggøres information om kategori A-projekter, som EKF er i gang med at vurdere miljø og social bæredygtighed på, og kategori A-projekter som EKF tidligere har vurderet inden for de seneste to kalenderår.
​Et kategori A-projekt har potentielt væsentlige påvirkninger på miljømæssige eller sociale forhold i henhold til OECD Common Approaches. EKF offentliggør information om alle kategori A-projekter minimum 30 dage, før vi beslutter, om EKF kan deltage. 
 
Har du spørgsmål eller kommentarer til kategori A-projekterne, er du velkommen til at kontakte vores CSR-afdeling på ekfcsr@ekf.dk
 
2018

Canakkale Bridge project/Tyrkey 
17 January 2018

The project is located in Tyrkey. It comprises 88km of motorway from Malkara to Canakkale including a 3.6km suspension bridge, that will eventually form the western link of the Kinali – Tekirdag – Canakkale – Savastepe Motorway project.
 
The project is classified as a Category A-project according to OECD Common Approaches. EKF is assessing the project against IFC Performance and relevant sector specific and general Environmental, Health and Safety Guidelines.
 
Please find more information about the project here.
 
If you have any comments or need any further information, please contact Louise Them Kjølholm, ltk@ekf.dk 
 
 
2017

Transmission line/Angola 
31 August 2017

The project is located in Angola. It is a 240 km long 400kv transmission line, which will be connecting the hydroelectric power plant Laúca with a transformer station near Luanda.
The project is classified as a Category A-project according to OECD Common Approaches. EKF is assessing the project against IFC Performance and relevant sector specific and general Environmental, Health and Safety Guidelines.

Please find more information about the project here.
 
If you have any comments or need any further information, please contact Louise Them Kjølholm, ltk@ekf.dk 

 
Ryenosa Wind Farm, Mexico
30 June 2017

The wind farm is located in the northern part of Mexico, 40 km south of city of Reynosa in Tamaulipas. The wind farm will consist of the construction and operation of 123 turbines with a total of 424 MW and a 29 km transmission line to the Aeropuerto Substation. The project is formed by five clusters divided into two windfarm areas. The two areas will be interconnected by a 19 km transmission line. The project is classified as a Category A-project according to OECD Common Approaches. EKF is assessing the project against IFC Performance and relevant sector specific and general Environmental, Health and Safety Guidelines.
 
Please find more information on the project here.

If you have any comments or need any further information, please contact Sine Christiansen, sch@ekf.dk

 
Walney, Irish Sea
29 May 2017

Walney Extension is an offshore windfarm, which is located in the Irish Sea around 19 kilometers off the coast from Blackpool. The project is an extension of an existing windfarm and the extension will consist of a total 87 wind turbines and a capacity around 659 MW.

The project is classified as a Category A-project according to OECD Common Approaches and EKF Guidelines. EKF is carrying out environmental and social due diligence against relevant laws and regulation, the Equator Principles and OECD Common Approaches.

Please find more information on the project in the Environmental Impact Assessment, which can be found here.
 

If you have any comments, please contact Jakob Majcher, jam@ekf.dk

 
Zadar 6, Croatia
18 April 2017

Zadar 6 is an on-shore wind farm which is located at Gracac, Croatia. The project is an expansion of an existing windfarm and will consist of 13 turbines and an installed capacity of approximately 44MW. The final design of the windfarm after the capacity expansion will consist of 17 windturbines and have an installed capacity of approximately 53MW. The project is classified as a Category A-project according to OECD Common Approaches because of its close proximity to a Natura 2000 site. The proximity of the Natura 2000 site was considered during the project’s Environmental Impact Assessment conducted and approved in accordance with the national law. EKF is carrying out environmental and social due diligence against relevant laws and regulation and OECD Common Approaches.


If you have any comments, please contact Jakob Majcher, jam@ekf.dk

 
Puerto Madryn Wind Farm, Argentina
9 February 2017
 
The wind farm is located in Patagonia close to the city of Puerto Madryn. The wind farm will consist of 65 turbines with an installed capacity of 220 MW and will be developed in two stages. EKF is assessing the project against IFC Performance and relevant sector specific and general Environmental, Health and Safety Guidelines.

Please find more information about the project here: Puerto Madryn Wind Farm

If you have any comments or need any further information, please contact Sine Christiansen, sch@ekf.dk

​I 2014 havde EKF fokus på, hvad vi kan gøre for at mobilisere flere private klimainvesteringer.

CSR-rapport 2014

​I 2014 havde EKF fokus på, hvad vi kan gøre for at mobilisere flere private klimainvesteringer.
Læs rapport
Du er meget velkommen til at ringe til os eller sende os en mail. Så ringer vi dig op, så hurtigt vi kan og senest i morgen.

Ring eller skriv til EKF

Du er meget velkommen til at ringe til os eller sende os en mail. Så ringer vi dig op, så hurtigt vi kan og senest i morgen.
Kontakt EKF
Køberfinansiering, driftskapital og sikkerhed. EKF hjælper dine internationale forretninger med at vokse.

Det hjælper vi med

Køberfinansiering, driftskapital og sikkerhed. EKF hjælper dine internationale forretninger med at vokse.
Læs mere
Index for robots